玻璃鋼防腐工程施工前需要準備哪些工作
1、技術準備:施(shi)(shi)(shi)工(gong)管理人員要(yao)(yao)認真閱讀施(shi)(shi)(shi)工(gong)工(gong)藝標準及設計(ji)要(yao)(yao)求,與具體施(shi)(shi)(shi)工(gong)人員做好技術交底(di),認真按設計(ji)要(yao)(yao)求施(shi)(shi)(shi)工(gong)。
2、施工操作面要求通風良好,玻璃鋼防腐工程本工程采用的風機大風量風機。
3、送(song)風(feng)(feng)(feng):將(jiang)進(jin)風(feng)(feng)(feng)風(feng)(feng)(feng)機(ji)(ji)設在水罐外(wai)面空(kong)(kong)氣流通(tong)順暢的(de)地(di)(di)方用風(feng)(feng)(feng)管(guan)接(jie)通(tong)風(feng)(feng)(feng)機(ji)(ji)的(de)進(jin)風(feng)(feng)(feng)口,進(jin)風(feng)(feng)(feng)風(feng)(feng)(feng)管(guan)的(de)另一端(duan)接(jie)到地(di)(di)面上或有新(xin)鮮空(kong)(kong)氣的(de)地(di)(di)方向(xiang)里面送(song)風(feng)(feng)(feng),這(zhe)樣(yang)可以保證向(xiang)池內吹注新(xin)鮮空(kong)(kong)氣。風(feng)(feng)(feng)機(ji)(ji)的(de)出(chu)風(feng)(feng)(feng)口由風(feng)(feng)(feng)管(guan)直接(jie)通(tong)到水池內部工作(zuo)面上或不易通(tong)風(feng)(feng)(feng)的(de)角落(luo)。
4、排(pai)風(feng)(feng):將(jiang)排(pai)風(feng)(feng)風(feng)(feng)機的風(feng)(feng)口接通到水池內部(bu),出風(feng)(feng)風(feng)(feng)管的另一端接通到室外(wai)直接向外(wai)面排(pai)出污濁空氣,這(zhe)樣就可以(yi)較大(da)限度降低池內(nei)的潮濕度和(he)有(you)害(hai)氣體。施工(gong)中向外排(pai)風時,應將污濁空氣排(pai)到沒(mei)有(you)人(ren)員施工(gong)的工(gong)作面上,盡量減少(shao)對其他施工(gong)隊(dui)伍的影(ying)響(xiang)。
5、工(gong)具準備(bei):自備(bei)工(gong)具。
6、材(cai)料準備:環(huan)氧樹脂、901瓷釉、固化劑、稀釋劑、玻璃布(bu)、二丁脂。
7、施(shi)工時的(de)(de)腳(jiao)手架(jia)要牢固(gu),腳(jiao)踏(ta)板(ban)要用木(mu)腳(jiao)手板(ban)。在6米深(shen)的(de)(de)水(shui)池內腳(jiao)踏(ta)板(ban)鋪(pu)3層,4米深(shen)的(de)(de)水(shui)池內腳(jiao)踏(ta)板(ban)鋪(pu)設2層,以便于(yu)玻璃布的(de)(de)施(shi)工。